maintenance 1, to ensure cleaning of the machine and the surrounding environment. 2, the timely removal of accumulated material in the hopper, the sensor normal to zero. 3. Check the oil lubrication points adequacy of the gas system in the mist should maintain an adequate amount of oil. 4. Check the electrical, czp508e concrete vibrator concrete poker vibration poker electronics or without overheating, abnormal noise, the instrument indicates whether the normal signal system is intact. 5, regular inspection, adjustment cylinder, valve and solenoid valve, so that the opening and closing to meet the requirements. 6, regularly check the system, such as tainted ash, leakage, oil spills and leakage phenomenon must be promptly treated. 7, mixers and the hopper should be cleaned once every four hours, in order to avoid residual concrete consolidation, impede the normal operation. 8, the class should let go of the air compressor, air tank and filters the water inside, and troubleshoot the operation appears. 9, butterfly valves, mixers, solenoid valves, air filters and oil mist, etc. in accordance with the maintenance manual. Supply and maintenance 1, class work must be carried out before the conveyor belt load inspection, clean up debris, mud stick, fastening various parts of screws, adjust the belt deviation phenomenon, all rotating parts should be flexible rotation. 2, electric drum by the use of manual require regular oil changes. 3, after use for six months to check and top-up at the turning parts bearing grease, after an oil change once a year to conduct a comprehensive demolition. 4, Sweepers regularly examine and adjust the frying position close to the belt, to ensure clear material properly. Metering and maintenance 1, the class must examine and adjust zw-10t mikasa concrete vibrators with good quality 2.2kw the weighing hoppers each soft interfaces, there are loose on the length of the holding, to ensure measurement accuracy. 2, after the winter shutdown, should the water supply system, the supply of water in all admixtures drained. 3, additives such as seasonal deactivate the pump must be backwashed to prevent precipitation in the pipeline and pump additive product sticky or no solvent. Stirring maintenance Mixers maintenance See "JS series twin-shaft mixer Maintenance Manual", but pay special attention to the following points: 1, class inspection shaft seal chamber, and seal the distributor and export pipeline is smooth, whether full of grease all lubrication points and gear box if there is enough lubricant (grease). 2, each class to observe electric grease lubrication pump oil barrel are empty, near-empty to fill in time, does not allow non-oil operation. 3, class work shift must be fully clean up inside and outside the mixing tube, discharge doors, etc. The product material, and rinse, rinse dirty adhesive material to chisel out regularly. 4, weekly stirring blade adjustment must be tightened again in order to prevent accidents caused by leaves fall off. Supply and maintenance 1 week must cement warehouse roof dust means vibrator repeatedly, cleared away the dust bag sticky gray (filter rod), make sure to run the gas flow. 2, the inlet duct wall, screw conveyor discharge frz-50 insert pneumatic concrete vibrators lastest price port must be comprehensive clean-up once a week to prevent hard caking and debris lay a trap and a lack of material failure. 3, a long time do not use the need to vent cement inside the screw. 4, the outer ball bearing screw conveyor head office, at the central support bearing grease must note once every four hours (WAM screw conveyor without greasing), the tail gearbox oil change first time was 500 hours, later replaced annually a grease (lithium grease No. 00)